DATE : 30/07/2020

AFITEXINOV is installing 2,340 m2 of SOMTUBE FTB in Bayonne

Mercedes called upon AFITEXINOV as part of the construction of its new dealership in Bayonne (64).
2,340 m2 of SOMTUBE FTB were installed for drainage under concrete slab.

This solution facilitates :
- Savings in terms of earthwork and granular material volumes : carbon footprint reduced by 84%
- Quick installation
- The pouring of the slab directly on the product (after installation of steel reinforcements), without clogging the geotextile thanks to the polyethylene film

Company : Etchart Construction
Project Manager : katy sardain
Merchant : MTP LAHONCE